Tel Renovation
Symposium ‘Wind turbines – damage to structures and prevent’ the forces that work through wind and rotation of the load-bearing structures of mast and Foundation for wind power plants, are enormous. The consequences of a faulty design or construction also, because in the best case requires the decommissioning or irreparable damage to the system long downtime and a costly renovation, in the worst. The foundations are still vulnerable. Today, not completely crack free concrete is known. The problem is the uncertainty about when ingress of water leads to a degradation of the steel reinforcement and renovation is necessary. In the past, individual losses have already led to long shutdowns and downtime. When 25,000 wind turbines in Germany viable long-term concepts for waterproofing and renovation to an industry important success factor. “The Symposium wind turbines damage to structures and their prevention” is intended for planners, designers, operators, Insurance and employee of the technical monitoring and approval authorities.
Under the direction of Prof. Bellmer and Mr Klaus Deininger, the causes and solutions for static and dynamic overloading and the correct interpretation and choice of materials are illuminated. Practical examples illustrate the complexity and scope of faulty work. The event takes place on the 25th 26.5.2011 in the House of the art in food. The detailed event programme of technology e.V., Tel.